Friday, June 2, 2017

FREE Webinar on Job Shop and Machine Shop Scheduling

This webinar replay is on exactly how to Get More Jobs Done Faster. It is NOT theory but a specific "how to". This is the same program recommended by Westinghouse to their vendors and recommened internally to Schlumberger plants. To participate LIVE in one of these webinars and to get YOUR questions answered, sign up here: https://www.velocityschedulingsystem.com/webinar/ Space is limited to to ensure we get all your questions answered. (replay no longer available, please sign up for our next webinar) If you're looking to  improve your scheduling and you own or run a job shop or machine shop, you don't want to miss these insights!  This video will be taken down, so watch while you can. Dr Lisa Lang (know as Dr Lisa) will be your webinar presenter.  She is a Theory of Constraints expert and recently worked for Goldratt Consulting owned by Dr Eliyahu M Goldratt, author of The Goal and father of Theory of Constraints.  Dr Lisa developed the Velocity Scheduling System Coaching Program to hand hold companies through the process of implementing the Theory of Constraints scheduling technique called Drum Buffer Rope. Leave your questions on Velocity Scheduling System Coaching Program and tell me what you thought of the webinar.   Did you like it?  Did it answer any questions for you? CLICK THE COMMENT LINK ABOVE!!

http://velocityschedulingsystem.wordpress.com/?p=298

Precision Machining Job Shop Scheduling Client Success Story

FOR IMMEDIATE RELEASE Manufacturing and Theory of Constraints Expert Dr. Lisa Lang Shares Client Success Story Tanya DiSalvo, President of Criterion Tool, shares her story of how her precision machine shop used Velocity Scheduling System to achieve record profits.   Green Valley, AZ – November 14, 2012 – “Dr. Lisa” Lang, President of the Science of Business and Theory of Constraints expert, is proud to share one of many client success stories. Tanya DiSalvo is the President of Criterion Tool (founded in 1953) and an active member of both NTMA (National Tooling and Machining Association) and PMPA (Precision Metal Products Association).  Tanya has utilized Dr. Lisa’s Velocity Scheduling System at her machine shop to improve on-time delivery and reduce lead times. Tanya DiSalvo’s case study and success story (written by Mike Touzeau) can be found at https://www.velocityschedulingsystem.com/site/wp-content/uploads/2012/10/Tanya_Success_Story_v5.pdf Here is an excerpt: “It’s so different from what we’ve seen in the world of manufacturing that it sounded too good to be true. At first as a team we couldn’t get our arms around it, but Dr. Lisa said she was going to give me my money back if it didn’t work, so we were going to do everything she said.” They liked the homework, but several of her 30 employees, including her dad, who was then  consulting and observing as he neared retirement, bet some real cash against her that it wasn’t going to work. “I was pretty sure they thought this was just another flavor of the month. Before VSS we were all frustrated,” she remembers, because they were always  trying to manage the “slop,” as she calls it—the jobs that got bogged down and often carried into the next month,  with select customers always suffering. Once they saw how the system could facilitate movement of jobs, things started clicking. “As we worked through the Velocity Scheduling process, we got more and more in control. We could focus our resources where we needed them the most. We didn’t have to monitor the jobs, the deadlines, the priorities anymore.” “It was all the  same people just changing their focus.” To learn specifically what Tanya did to improve her machine shop scheduling, watch a 47 minute webinar on “How to Get More Jobs Done Faster” at https://www.velocityschedulingsystem.com/webinar/ “Dr. Lisa” Lang is one of the foremost Theory of Constraints experts in the world and a sought after manufacturing expert having been named the 2012 Manufacturing Trendsetter in the USA Today for her inexpensive and guaranteed Velocity Scheduling System Coaching Program that has dramatically improved performance of well over 100 highly custom job shops and machine shops.  She has also appeared in CBS News, The Wall Street Journal, Finance.com, About.com, Gear Technology, CNBC, MoldMaking Technology, The Fabricator, NTMA’s The Record and many others. She is active in helping the reshoring of  manufacturing back to the U.S. and in the NTMA, PMA, and AMT communities having helped member companies to reduce their lead-times and improve due date performance. She worked with Dr. Goldratt who is the father of Theory of Constraints and author of the bestselling book, The Goal. Dr Lisa is the President of the Science of Business specializing in increasing profits of highly custom manufacturers by applying Theory of Constraints, Lean and Six Sigma (TLS) to operations with Velocity Scheduling System and to engineering/design with Project Velocity System and to marketing with her Mafia Offer Boot Camp. ### Contact: Dr Lisa Lang Science of Business, Inc DrLisa@ScienceofBusiness.com   keywords: Dr Lisa Lang, Dr Lisa, Theory of Constraints, Velocity Scheduling System, job shop scheduling, machine shop scheduling, Goldratt, reshoring manufacturing, Success Story, Case Study

http://www.velocityschedulingsystem.com/?p=1654

Dr Lisa and Theory of Constraints featured in Wire Forming Technology International

Dr Lisa was featured in the Fall 2011 Wire Forming Technology International magazine with an article titled: Velocity Manufacturing: Stop focusing on efficiency and focus on velocity to reduce lead and queue times, and to increase lead-time predictability, on-time deliveries, quality and cash flow. The article explains how highly custom job shops and machine shops can schedule and change their thinking using Goldratt's Theory of Constraints to get more jobs done faster with the same people and resources. You can check it out here: WFTI Fall 2011 Velocity Manufacturing Article

http://www.velocityschedulingsystem.com/?p=1308

Sunday, May 28, 2017

FREE Special Report for Machine Shop Owners

Click the link below to download the free special report for machine shop and job shop owners titled:  "The 9 Biggest Challenges to Scheduling YOUR Job Shop and Why Most Schedules are Dead on Arrival!" by Dr Lisa Lang.
https://www.VelocitySchedulingSystem.com/ebook/
After you read this free special report, please CLICK on "COMMENTS"above and post your comments. I would love to know if you agree or disagree and your reasons!

http://www.velocityschedulingsystem.com/site/?p=296

Machine Shop gets BIG results with the Velocity Scheduling System

By Dr Lisa Lang Tanya DiSalvo, President of Criterion Tool & Die, just sent me this email:
Lisa & Brad- We finished off our fiscal year end 10/31..... could have never turned things around w/out the V V S.!!!!!! We finished the year in the black because 'the board' helped us focus on FINISHING! The last 6 months also saw a serious improvement in on time delivery, and an increase in the volume of orders thru our building. We have accepted a long running project, and feel that the self releasing mechanism of "The Board" has allowed us to tackle this type of work effectively while still serving our job shop type customers. No job gets lost in the shuffle no matter how longs its in the building, and the resources (people) have become utility ball players! I have included a snapshot since May of our numbers. Jumped back into Mafia Offer training.... Got the itch to know more!!! THANK YOU! Tanya DiSalvo Criterion Tool
And here are some of their key meterics: [caption id="" align="aligncenter" width="441"]The Velocity Scheduling System helps this machine shop get on time! The Velocity Scheduling System helps this machine shop get on time![/caption] Jobs spend less time in the shop -- job velocity increases! Criterion ships more $ with the Velocity Scheduling System! Criterion has almost doubled the dollars out the door. If you ship twice as much and you don't hire anyone or buy any equipment -- what happens to your profits? Tanya is now working on Criterion's Mafia Offer. Because by implementing the Velocity Scheduling System, they have uncovered capacity. So the next step is to sell that capacity. If you need to get your operations in order, you can sign up here: www.VelocitySchedulingSystem.comIf registration is closed, you will have the opportunity to get on the waiting list to be notified if there is another session.

http://velocityschedulingsystem.wordpress.com/?p=281

30 Job Shops Improve Scheduling

30 Job Shops Improve Scheduling

By Dr Lisa Lang

In 2009 we significantly improved the scheduling and operations of 30 custom job shops and machine shops. These 30 shops improved due date performance (DDP) to at least 97%, reduced lead-time by 50%, all while improving communication and reducing chaos. Isn't it time for YOU to do the same? Here's an email that I was copied on just yesterday. It's from one of my VSS clients to someone he is recommending the course to:
Jose, This is the best system for Manufacturing that I have encountered. This is our next step in the cables shop and covers the entire value stream. It is a web based course that you take 2 hours twice a week for a month and the person walks you through your specific implementation and helps you through the problems. We are currently finishing the training and building the new board. Trust me I have seen and implemented many JIT, Lean Six Sigma systems in the past and this is the best. I have copied Dr. Lisa the creator and facilitator of the program. She is top notch. As well I am attaching one of her free reports on how the system compares with other systems. Sincerely, Luis Fernandez Schlumberger Manufacturing Engineer IPC-Cables
It's amazing what can happen when a team of people participate together and acquire a shared vision.
And did I mention that 3 of the companies participating in group 5 were from multi-BILLION dollar conglomerates?
And 4 of the companies in group 5 were Westinghouse vendors because Westinghouse recommended their vendors sign up?
I just laid out my recommendations, the logic and provided a little motivation.  They did all the work.
The next group is starting soon and you can sign up at www.VelocitySchedulingSystem.com.  The Velocity Scheduling System Coaching Program is based on Goldratt's Theory of Constraints.  So if you ever wanted some guidance putting The Goal (and Drum Buffer Rope) into action, now's the time!